Carnac Bridge Mumbai is the most important bridge in the Chhatrapati Shivaji Maharaj Terminus Masjid Bunder and Mohammed Aleem Marg area in South Mumbai.Declaring this 125-year-old bridge dangerous, the Brihanmumbai Municipal Corporation had started the work of repairing this bridge. The Central Railway had taken up the work of this bridge in August 2022 and completed it, and after that the work of this bridge continued.

The carnac bridge Mosque is located some distance from the port and connects it to the Pi de Mello route, so this bridge is also very important in terms of transportation.The Brihanmumbai Municipal Corporation had also taken up the work of this carnac bridge to maintain the existing road connecting the east and west areas of the Masjid Bunder area. The work of this bridge was proposed to be completed by June 10 and was also planned accordingly.But even after June 10, this bridge has not been opened for traffic, so ordinary Mumbaikars are currently waiting for this bridge to be opened for traffic.
Carnac Bridge is important for transportation
The construction of the bridge was done as per the planned plan approved by the Central Railway. Most of the works within the municipal limits like RCC, disc lake, asphalting have been completed.Also, other works related to transportation such as lane marking, street lighting, installation of directional signs and painting are currently in progress.However, the city of Mumbai is currently receiving heavy rains, so these works have been delayed due to the delay in the rains. Officials said that even if the rains stop one day, the work will definitely be completed and the bridge will be opened for traffic
The work of paving bridges and other bridge works was also going on in various parts of Mumbai, such as Vikhroli and Andheri. Of these, the work of flowers in Vikhroli and Andheri areas has been completed.But the work on this Carnac bridge has not been completed. The Municipal Corporation had planned to complete all the works on this bridge before the monsoon. Even after June 10, the bridge has not been opened for traffic as the work on this bridge has not been completed.Officials have said that only minor works are currently pending on this carnac bridge and that these minor works will be completed as soon as possible and this bridge will also be opened for traffic, the officials said at this time.
The contractor working on the Carnac Bridge was also penalized at some point. The contractor was fined 1 crore 80 lakhs.The main reason for this was the non-delivery of the girders on time. The work of the girders was expected to be completed by April 30, but the girders were delayed, resulting in a fine of Rs 10 lakh each being imposed on the contractor on May 1 and 2.Even after that, there was a delay in the delivery of the girder, due to which a fine of Rs. 20 lakhs was imposed on the contractor for each day, resulting in a total fine of Rs. 1 crore 80 lakhs over a period of ten days.
The total length of the Carnac Bridge is 328 meters, of which 70 meters is within the railway area and the length of the access road within the municipal area is approximately 230 meters.Of this, 130 meters are in the east and 100 meters in the west. The work on the first girder of this bridge was completed in October, while the work on the second was completed in January.The administration’s goal at this time was to complete the remaining work in the next four months. With the permission of the traffic police, work was going on for this bridge 24 hours a day, so ordinary Mumbaikars want this bridge to be opened for traffic as soon as possible.